united grinding
PROJECT OVERVIEW
The United Grinding facility in Miamisburg, located along I-75, brought together previous Miamisburg and Virginia operations into a modern, 89,000 square foot space. Despite the 40-foot elevation difference, the site included future expansion areas, 200 parking spaces, a convenient pull-through truck entrance, and entertaining amenities like an outdoor grill and basketball court for employees. With European-inspired customization, the facility featured durable materials, custom epoxy flooring, and Thermofoil cabinetry. The manufacturing area was equipped with three custom-engineered sliding steel doors, and special sound-rated glass keeps things quiet despite the nearby highway.
We were delighted to build this incredible space. The office area promotes unity and transparency with full-height glass walls and storefronts that make it easy to see between offices and manufacturing areas. Top-of-the-line LED fixtures and a color-changing lighting control package highlight the company’s branding. Congratulations, United Grinding, on an outstanding facility to build a stronger tomorrow!
COMPLETED
2018
LOCATION
Miamisburg, OH
SCOPE
Industrial
DESIGN-BUILD
Ferguson Construction
GALLERY
RELATED PROJECTS
Miami Valley Polishing
Completed: 2022
Location: Sidney, Ohio
Square Footage: 68,960
Miami Valley Polishing
Franklin Township Bus Maintenance Facility
Completed: 2023
Location: Indianapolis, Indiana
Square Footage: 8,710
Franklin Township Bus Maintenance Facility
TS Tech Indiana
Completed: 2022
Location: Indianapolis, Indiana
Square Footage: 206,250
TS Tech Indiana
